Nasosnaya transformer substation
Location:
near the village of Sabyndy, Korgalzhyn district, Akmola Region, Kazakhstan.
Project name:
Construction of the Nasosnaya 35/10 kV transformer substation
Expected funding sources and arrangements:
The project is to be financed from the national budget.
Construction period:
2026
Total estimated construction cost
KZT 1,126,784.295 thousand, including construction and installation works — KZT 152,352.91 thousand, equipment — KZT 974,431.386 thousand.
Description:
The 35/10 kV transformer substation near the village of Sabyndy will power the planned water treatment plant and its associated utility structures. The design provides for power transformers with a combined capacity of 2×16 MVA with redundancy, ensuring reliable, uninterrupted operation. The substation receives power at 35 kV, steps it down to 10 kV and distributes it to consumers. It uses modern relay protection, automation and dispatch control solutions that deliver a high level of reliability and energy efficiency and comply with current standards.
  • Design of the site plan (GP), reinforced concrete structures (KZh) and external power supply (NES): electrical part (EP), cable facilities (KKh), relay protection and automation (RZA), automated control systems (ASU), automated electricity metering (ASKUE), low-current systems (SS).
  • coordination with existing utility networks
  • development of design and estimate documentation (PSD) and cost estimates
Substation plan and lightning protection
Equipment layout in the 10 kV indoor switchgear
Power transformer installation — plan with sections
Sections 1-1 and 2-2
Three-pole disconnector installation
Recloser unit installation
Contacts
Address:
Astana, Saryarka district, Saryarka St., building 8/1, NP­19
Phone:
8 (778) 818-83-21
E-mail:
info@astanaliq.kz
Astanalyq Kazakhstan Engineering and Design Institute LLP
Made on
Tilda