Modular pavilion on Momyshuly Ave., Astana
The construction site is in Astana, Almaty district, along Bauyrzhan Momyshuly Avenue near building No. 27 (plot 27G), within established residential and public development.
Construction of a modular pavilion at: Astana, Almaty district, B. Momyshuly Avenue, plot No. 27G
Expected funding sources and arrangements:
Total estimated construction cost
KZT 47,111.761 thousand, including construction and installation works — KZT 36,149.936 thousand.
Detailed design documentation was produced for the construction of a modular pavilion connected to the existing municipal utility networks. The facility sits within established urban development. The design provides for external water supply, sewerage and heat supply networks in line with the applicable regulatory requirements and technical conditions.
- development of detailed design documentation
- design of external water supply and sewerage networks (NVK) and heating networks (TS)
- coordination with existing utility networks
- development of the construction organisation design (POS) and cost estimates
Heating networks at the Mobile Pavilion facility
Heating networks at the Mobile Pavilion facility